Three steps to a state of the art plant

Professional preparation and planning

A qualified team that is professionally prepared will ensure the timely completion of any air conditioning, ventilation or environmental technology. At KLU, we have our own CAD department to guarantee an efficient service.

Firstly, the system diagram and the assembly plans are drawn up to make sure the project stays on schedule. This ensures the plant is planned meticulously and the most suitable equipment is selected. Control diagrams and cable lists are then drawn up and, if necessary, breakthrough plans for walls and material pull-outs for sewer production.

Our specialists will pay attention to the subsequent maintenance needs of the plant. KLU also coordinates more extensive projects with other tradespeople and maintains constant contact with authorities and experts.

Preparing for assembly

The second step is the assembly preparation. Here we complete risk assessments, occupational safety checks and material transport as well as testing the accessibility of the construction site, scaffolding and suppliers. We take care of all the background logistics required for the smooth running of the project.